Corby | Goods Lift and Workstations
- KTCS Ltd Team
- Apr 29, 2022
- 1 min read
Updated: Jan 28, 2024
Period: Early 2022
Type: Project Management
Location: Corby
Client: Government related logistics
Project value: Value>£120k
The workflow setup at this Corby site was deemed unsuitable and the use of a forklift for loading was impractical.
The works included installing a new goods lift suitable for carrying several york trollies at a time. Alterations to fire protection and detection was required. Additional shelving, mail-sorting space and workstations were required. The works also required the installation of additional power (lighting and emergency lighting) and data points.